RB iconIP iconMPE iconRBAS iconRouse icon
FavoriteFavorito
sharePartilhar
Save searchGuardar pesquisa
Imprimir

INFO

Linha de produto
Equipamentos de perfuração direcional horizontal
Marca / modelo
PERFORATOR RBZ 60 Rohrberst- und Zuganlage
Ano
2023
Condição
Novo/Nunca usado
Localização da máquina
Walkenried, Niedersachsen
País
Germany
Grau geral
1
2
3
4
5
Mascus ID
2D642D8F

PREÇO

Escolha a moeda

DETALHES

Informações de condição/garantia
Neuzustand, Gewährleistung 12 Monate
Peso em transporte
500 kg
Dimensőes em transporte (CxLxA)
700 x 600 x 300 mm
Condições de entrega
FCA, CPT
Outras informaçőes
pulling unit - 4 hydraulic cylinders - stroke 210 mm - tractive force 600 kN - operating pressure max. 300 bar clamping unit ø60 mm - hydraulic cylinder - stroke 15 mm - operating pressure 310 bar - maximum pressing force 1,260 kN - operating pressure max. 300 bar - holding jaws ø60 mm holding unit ø60 mm - hydraulic cylinder - stroke 25 mm - max. clamping force 128 kN With the PERFORATOR RBZ-series bursting systems, pipes can be renewed and renovated in an environmentally friendly manner and without trenching in old routes. Depending on the requirements and the damage to the old pipeline, various methods can be used. The static pipe bursting method is used for the renewal of pipelines in old routes. Regardless of whether it is a gravity or pressure pipeline, the old pipeline is cut into segments by breaking or cutting, and displaced radially into the surrounding soil. At the same time, a new pipe of the same or larger dimension is pulled in. The bursting method is suitable for almost all old and new pipe materials. The pressing/drawing process involves the complete replacement of existing pipelines in a single operation. The old pipe is completely removed from the ground. The new pipe can be drawn in with the same or larger dimensions. The auxiliary pipe method is also a route-equivalent, complete replacement of existing pipelines in two work steps. It is particularly suitable for old pipes made of cast iron, ductile cast iron, steel and fibre cement. In the relining process with annular gap, pipe strings or individual pipes are inserted into the existing pipelines. The pipe dimension is reduced and the annular gap is filled depending on the process variant. In relining processes without an annular gap, a PE pipe string with a reduced cross-section is inserted into the old pipeline. In the reduction process, the new pipe later lies close to the old pipe wall (close-fit). Both process variants are suitable for both gravity and pressure pipes. The RBZ series comprises two machine sizes. This means that pipelines up to a pipe diameter of 1.000 mm can be laid trenchlessly.Mostrar mais

PERFORATOR GmbH

Bei dem Gerichte 37445 Walkenried Niedersachsen Germany
Receber notificação por e-mail
report adDenunciar anúncio suspeito